POPPUMP Fiji Technical Center

Tel:(001)3474109611

POPPUMP logo

POPPUMP Fiji Technical Center , Discuss Technical Problem , Suply After Service Online of Fuel Dispenser, Please Regist Firstly

D-GAQ FUEL DISPENSER

D-GAQ

D-GAQ FUEL DISPENSER

FlowMeter Type: Optional

Accuracy : ±0.2%

Pressure Loss (kg/cm) :Under 0.25

Motor Voltage(V) :110V/220V/380V,50Hz/60Hz

Capacity(hp) :1HP(0.75kw)

Input Voltage : 110V/220V/380V,50Hz/60Hz

Nozzle: Auto Shut-off Nozzle

Environmental Condition: -40~~+55degree

Control Type : Solenold Vale Control Type

Preset : Function Provided(Small LCDIndicator)

Display(Counter): Type LCD and Bright Backlight

Digit of Volume : 0~~999,999(6 Digits),Decimal point can be changed

Digit of Amount : 0~~999,999(6 Digits),Decimal point can be changed

Digit of Unit price : 0~~9999(4 Digits),Decimal point can be changed

Digit of Total Range :0~~99,999,999,99

Optional Display :Type LCD and Bright Backlight

Digit of Volume : 0~~99,999,999(8 Digits),Decimal point can be changed

Digit of Amount : 0~~99,999,999(8 Digits),Decimal point can be changed

Digit of Unit price: 0~~999999(6 Digits),Decimal point can be changed

Digit of Total Range : 0~~99,999,999,99

Totalizer: 1~~9,999,999

Hose:4.5m

Weight :280kg.

Dimension(L×W×H) :900*620*2180(mm)

Dimension(L×W×H)Of Qty of Container: 40ft: 45 20ft: 22

products links

links

technical archives

    ents on metrological management. The chapter briefly introduces fuel dispenser’s metrological management and technical requirements, appraisal related and attentions. Article I Met fuel dispenser rological management and technical requirements In accordance with The Law on Metrology of fuel dispenser’s legal management mainly includes following aspects: Model approval, initial approval, subsequent appraisal and inspection in operation. Model approval refers to an entire test, examination and assessment as to new model’s entire performance. Initial approval refers to assess whether or not the fuel dispenser made by manufacturer in accordance with the model having been ratification through a series of testing, as well as metrological performance with relative metrological rules and regulations. Initial approval really has two phases �- approval combined with factory test, and testing appraisal after installation. Subsequent appraisal is conduct fuel dispenser ed after long time since initial appraisal, from which considerable appraisal period is set down according to fuel dispenser related requirements. Periodical appraisal is also regarded as the continued subsequent appraisal. Fuel dispenser’s measuring performance within appraisal period needs to be examined, so filling station should deploy self-check standard instrument (no less than 20L) to examine and inspect. Apart from applied to fuel dispenser approval, JJG443-98 also adapt sample testing and pattern evaluation. Although there are two items of accuracy and flow distance ratio conducted in initial approval and subsequent evaluation, there are other technical parameters different from approval as for fuel dispenser made after passing pattern evaluation, including minimum calculated volume and minimum cubic variable. Several items reference to the pattern evaluation and sampling testing of mechanical hydraulic section of fuel dispenser as followed: Accuracy testing The testing’s purpose is to define the flow curve and verify the tolerance scope in which the allowed maximum tol

technical specification

    able EPS fails to print. Cashier performs any attempt to fix it: if   successful the transaction completes successfully.  9. If the printer is not available EPS fails to print fuel dispenser . Cashier performs any attempt to fix it: if not   successful the transaction aborts and reverse or not according to EPS rule for the card (e.g. It   might even be necessary to swipe again the card to reverse the transaction leaving the choice   to the cardholder).  10. If EPS gets into an exception status transaction not possible to complete EPS tells POS   that payment was not ok. POS is still at the initial status and cashier selects another method   of payment.  August 2002 IFSF STANDARD FORECOURT PROTOCOL FP319_1.00   EPS POS INTERFACE SPECIFICATION   Page 16 of 146  11. If POS fails to receive a response from EPS (EPS failure) the fuel dispenser cashier will act a procedure   on the POS and if the Eft receipt was printed and was ok the payment is v fuel dispenser alid anyway. POS   prints sales receipt. Cashier gives Customer EFT Ticket and Sales receipt. Otherwise the   payment is considered not ok the POS is still at the initial status and cashier selects another   method of payment.  12. If EPS tells POS the payment response but POS has failed (e.g. fails to get the   acknowledge). The payment is valid. The cashier acts an exception procedure tries to recover   the POS andor gives the customer a sales receipt for the paid receipt.  13. If authorisation ok EPS tells POS that payment was ok. POS prints sales receipt. Cashier   gives Customer EFT Ticket and Sales receipt.  14. If authorisation ko EPS tells POS that payment was not ok. POS is still at the initial status   and cashier selects another method of payment.  Scenario - (1) - Successful payment by card  Even if the ideal situation is that the sales receipt is printed before

we are committed to create the best workplace, encourage our staffs to put their own personalities into their jobs, and provide them a stage to show themselves.

    an Islamic school. Meanwhile, it continues to fund a Catholic school for which there is almost no Catholic demand. St Albert s is an extreme example of the faith schools system gone fuel dispenser awry. Muslims are drawn to it by its sound academic performance. They also like its stress on morals, even though St Albert s stem from the wrong religion. But mainly the school s student body reflects the changed ethnic makeup of Pollokshields, which is home to Scotland s biggest Pakistani community. A decade or two ago, almost every business along the suburb s main high street bore a Scottish clan name. Now the street is lined with halal butchers and shops selling salwar kameez. There are certainly signs that Muslims are getting keener on having their own schools. Back at St Albert s school gates, several mothers nod when Shamin Akhtar, a grandmother, says that if Catholics can have religious schools, then surely Muslims can too. In early Febru fuel dispenser ary, a group of parents at St Albert s interrupted the school s monthly mass, withdrawing around 12 children. fuel dispenser They had always had the right to do so but never exercised it. Yet many Muslims seem happy enough with the present arrangements. Amanullah De Sondy, a research fellow at the Centre for the Study of Islam at Glasgow University, says the campaign does not speak for all Muslims. “Taking an isolationist approach is not the way forward,�he says. The Catholic church has a long history of running schools, while Islam has no comparable hierarchy or structures. In England, the government proposes to bring 100 private Muslim schools into the state sector. Six—currently Britain s only state-run Muslim schools—have already made the switch. This official enthusiasm is motivated partly by a belief that Muslims are less likely to be radicalised in the heavily regulated state sector. Though the government enthuses about the “strong ethos�of a religious education, it can sometimes, alas, be a bit too potent. In Scotland, several previous experiments with pr